Since the last update I’ve added all the PE to the aft skirt. Now I need to add in the missing stringers on the fairings and fill the slot for the systems tunnel. I will be using the systems tunnel from the Monogram kit since it is longer and comes closest the proper length, therefore I need to fill the slot.
Below is a shot of one side with the PE and air scoops. You can also see the brass rod extending through the top of the skirt. I used some JB Weld to help hold it in place. The resin fins are from the New-Ware set and are just friction fitted to see how they look. I’ll wait to actually install them until it is painted.
One of the pictures is rotated 90 degrees to show one of the sides where the stringer had to be rescribed after removing the large hump.
There is also a view of the bottom with the brass heat shield in place. You can see the small amount of brass tube protruding that will be used to locate the center engine.
I’ve added the missing stringers to the the engine fairings. Below is a shot of the work in progress. They are .3mm styrene rod glued on with Plasti-zap CA. It doesn’t set quite as fast as thin CA, so I’ve got a few seconds to get them lined up properly. I used long strips to give me plenty of area to get my fat fingers in there to place them properly. After the CA sets then I can just snip them off with my X-acto. In the picture you can barely (on the right quadrant) see the that the depression for the systems tunnel is filled. I used some styrene sheet and then filler putty.
I’m using the Airfix interstage. The Monogram interstage has a taper that is too big for me to ignore. The Airfix part is more straight. I’ve also removed the four ulage motors and the extensions of the second stage detail that appear on the interstage. I’ve got some filling and rescribing to do on this part. Plus a PE part needs to be added.
Below are also a couple of shots of the S-IC. It is mostly done. Just need to do some filling where the systems tunnel from the main body meets the aft skirt. I’ve added all the PE to the S-IC. Both the aft skirt and the main body are from the Airfix kit.
I’ve also started on the S-II stage. I’ll be using the Monogram part for this. Since I have to remove all the molded on details anyway, I thought I’d use the Monogram part since it does not have that huge hump at the seam line in the stringer sections. At this point I’ve removed all the molded on details. I will have to remove some of the molded on stringers on the forward and aft stringer sections. They are too long. Time to make some measurements.
I’ve also removed the resin parts from their pour plugs. I’m amazed that I didn’t break any of them while removing the plugs.
Pretty good progress so far. Maybe I’ll make the July 20th deadline.