Week five turned out to be mostly a down week as well. The vanity, toilet cabinet and tub face came in this week. We were expecting another week delay, so we were very happy. They assure us that the toilet will not be in the tub (ha ha). Over the toilet cabinet. The new vanity. … Continue reading Remodeling the Master Bath Week 5
Month: September 2022
Remodeling the Master Bath Week 4
Well, smooth scheduling came to an end this week. We found out that our new vanity is delayed by two weeks. The shop has two big jobs that are in front of ours and they are running a little shorthanded so everything is being pushed back. Delays are to be expected I guess. To keep … Continue reading Remodeling the Master Bath Week 4
Remodeling the Master Bath Week 3
Week 3 started with them getting the shower floor prepared for the new tile. While that was getting done, the old wallpaper was removed. That required more mudding of the sheetrock to cover any wall damage from removing the wallpaper. The next day the floor tile started getting put in. Later the concrete board was … Continue reading Remodeling the Master Bath Week 3
1/72 Dragon Gemini Spacecraft Build Update 3
I continued painting with the astronauts and the cockpit. The astronauts are Tamiya Fine Primer White. I painted the straps with Tamiya Blue and the visors were Vallejo Gold. The cockpit interior is Vallejo White Gray. I glued the cockpit assembly to the heat shield which had previously been primed and then the edge of … Continue reading 1/72 Dragon Gemini Spacecraft Build Update 3
Remodeling the Master Bath Week 2
Week 2 of the remodel started with removing more sheetrock. Originally they thought that they could save the sheetrock on the ceiling, but that didn't quite work out. Turns out the ceiling joists ran the opposite way from what we thought. Plus the popcorn on the ceiling looked to be harder to remove than expected. … Continue reading Remodeling the Master Bath Week 2