Week 3 started with them getting the shower floor prepared for the new tile.

While that was getting done, the old wallpaper was removed. That required more mudding of the sheetrock to cover any wall damage from removing the wallpaper.






The next day the floor tile started getting put in.


Later the concrete board was finished and the joints mudded. They also cut in for the shampoo cubby. The concrete board was waterproofed and the shower bench was was added. With that done, the shower wall tile was started.



Next the toilet got moved and the floor tile and shower tile was finished.


They came in on Saturday and grouted all the new tile.





Week three comes to a finish with a good bit more done. Expectations for week four are high.