Sure enough on Monday the paint guys showed up and started masking the bathroom for the stain and paint to come. The next day they continued the masking and started staining some of the doors. They also installed a zipper door to help keep the stink at a minimum through the rest of the house. … Continue reading Remodeling the Master Bath Week 9
Month: October 2022
Remodeling the Master Bath Week 8
Well the hope of more progress this week evaporated when the painter had most of his crew go out with COVID-19. The job boss indicated that he might be able to get a guy out on Monday of next week to start on painting. Oh well. Can't do much about it. We did go get … Continue reading Remodeling the Master Bath Week 8
1/72 Dragon Gemini Spacecraft Build Update 5 (Final)
I ended up printing a new set of decals with narrower stripes. They may still be a bit too large at this scale but I'm reaching the limit of what I can print with these so they will have to do. Here I've started applying the decals to the retro adapter section. I made a … Continue reading 1/72 Dragon Gemini Spacecraft Build Update 5 (Final)
Remodeling the Master Bath Week 7
Monday started with the vanity top getting installed. The sinks got glued to the bottom of the granite. The shower curb top also finally got installed. That has the shower now ready to be measured for the glass. The backsplash around the tub platform was added as well. Counter top and back splash. Shower curb … Continue reading Remodeling the Master Bath Week 7
Remodeling the Master Bath Week 6
Week six was pretty much nothing. We did get the other vanity light finally. We had waited about three weeks for that to come in. We already had one, but needed a second one. The store we bought them from only had one in stock so we ordered the second one from the warehouse. Well, … Continue reading Remodeling the Master Bath Week 6