Remodeling the Master Bath Week 10

Week 10 was rather slow. They did finish the lacquer work on all the cabinet frames. The cabinet doors and drawers were taken back to the shop to get finished. They then did more masking to get it ready for paint. They are going to paint a primer coat first before the color coat goes … Continue reading Remodeling the Master Bath Week 10

Remodeling the Master Bath Week 9

Sure enough on Monday the paint guys showed up and started masking the bathroom for the stain and paint to come. The next day they continued the masking and started staining some of the doors. They also installed a zipper door to help keep the stink at a minimum through the rest of the house. … Continue reading Remodeling the Master Bath Week 9

1/72 Dragon Gemini Spacecraft Build Update 5 (Final)

I ended up printing a new set of decals with narrower stripes. They may still be a bit too large at this scale but I'm reaching the limit of what I can print with these so they will have to do. Here I've started applying the decals to the retro adapter section. I made a … Continue reading 1/72 Dragon Gemini Spacecraft Build Update 5 (Final)

Remodeling the Master Bath Week 7

Monday started with the vanity top getting installed. The sinks got glued to the bottom of the granite. The shower curb top also finally got installed. That has the shower now ready to be measured for the glass. The backsplash around the tub platform was added as well. Counter top and back splash. Shower curb … Continue reading Remodeling the Master Bath Week 7